ACT grid heavy-duty 9/16

$11.54 / LF

ACT-040 · MasterFormat 09 53 00 · LF

What’s in this rate

This unit is installing one linear foot of heavy-duty 9/16-inch ACT suspension grid, with tee share amortized along the run. The carpenter cuts, hangs, and levels the grid ready for tile. Tile, seismic bracing, supplemental hangers, and full layout are separate units.

Includes

  • heavy-duty 9/16 grid with 5% waste and hanger share
  • cut, hang, and level grid
  • small tools

Excludes

  • tile
  • seismic engineering
  • supplemental bracing
  • full layout beyond share
  • hanger-wire installation
  • fixtures

Build-up

Labor 0.105 hr × $55.00 wage and burden
$5.78
Material and small tools
$3.76
Direct rate (labor, material, and tools)
$9.54 / LF
Overhead 10% of direct
$0.95
Fee 10% of (direct and overhead)
$1.05
Loaded rate
$11.54 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.