Unit rates
Published unit rates for electrical, low-voltage, roofing, drywall, painting, concrete, flooring, plumbing, HVAC, fire protection, masonry, and structural steel work. Open a rate for the scope, labor and material build-up, and loaded price.
Browse by trade: Electrical · Low-voltage · Roofing · Drywall · Painting · Concrete · Flooring · Plumbing · HVAC
Estimating workflows: electrical estimating software, roofing estimating software, and unit rate estimating software.
Featured unit rates
- 3/4" EMT, exposed$12.01 / LFIncludes 10% overhead and 10% fee
- CAT6 plenum$3.44 / LFIncludes 10% overhead and 10% fee
- 60-mil TPO, mechanically attached$263.49 / SQIncludes 10% overhead and 10% fee
- Metal stud framing wall$7.82 / SFIncludes 10% overhead and 10% fee
- Place & finish 4" SOG$5.36 / SFIncludes 10% overhead and 10% fee
Open a trade above for the full published list.
Keep these rates in a private library
Create a free account to keep your private library, hours, and supplier quotes behind a login.
