Electrical estimating workflow
How commercial electrical and low-voltage shops turn published unit rates into private libraries and client-ready proposals.
PostHog analytics, user id only. No email or customer content. You can opt out. Privacy policy
Unit Rate AI uses PostHog to measure how the product is used, record masked session replays, and diagnose errors. We send a user id only. We do not send your name, email, phone number, or customer content. PostHog is our processor. Product events are kept for 1 year and session replays for 1 month. You can opt out of this collection on this browser. Privacy policy
Guides for contractors
Published unit rates for electrical, low-voltage, roofing, drywall, painting, concrete, flooring, plumbing, and HVAC work, including 3/4" EMT, exposed.
Practical articles for commercial estimators — how unit rates work, how to build a unit rate library, how takeoff differs from estimate and proposal, how commercial estimating differs from a house quote, how to estimate tenant improvements, how to log bid win rate, how to price jobs and change orders, how to write proposal scope and exclusions, and how proposal software fits into your bidding workflow. New guides are added here over time.
Looking for software? See our unit rate estimating software overview or pricing plans.
How to price a job as a contractor: build a unit rate for each item from material, crew time, and labor cost, measure the quantities, and multiply.
4 min read · Oct 19, 2026
Copying your last bid often copies its wrong rates. Keep one master unit rate list, update it with crew production at closeout, and bid from checked rates.
4 min read · Oct 12, 2026
Many bids are lost on labor productivity rates no one has checked, not on price. Compare bid and actual crew hours per unit, then rebuild each unit rate.
4 min read · Oct 7, 2026
How commercial shops price allowances and bid alternates from named unit rates — qty × rate, clear labels, recovery once — without silent lumps.
10 min read · Sep 28, 2026
How commercial shops reprice bid addenda from a unit-rate library — retakeoff, re-extend, revise scope, and keep the offer clear before award.
10 min read · Sep 21, 2026

How a commercial shop logs bid win rate — won and lost reasons, bid versus award, fee, and cycle time — and how unit rates keep that log clear.
10 min read · Sep 14, 2026

How commercial contractors estimate tenant improvements with unit rates — TI vs shell, library pricing, allowances, and suite proposal language.
11 min read · Sep 14, 2026

How commercial contractors write proposal scope, inclusions, and exclusions from unit rates so the owner accepts the same lines the estimate priced.
11 min read · Sep 13, 2026

How commercial and residential estimating differ on scope, unit rates, labor, waste, and proposals, and how Unit Rate AI prices both by the unit.
11 min read · Sep 13, 2026

How overhead, fee, and contingency differ on commercial bids, where each sits versus unit rates, and how to show the stack on an estimate or proposal.
11 min read · Sep 13, 2026

How takeoff, estimate, and proposal differ for commercial contractors, and how unit rates connect measured quantities to a client-ready total.
10 min read · Sep 13, 2026

How commercial contractors price a change order from unit rates: extend bid-day lines, apply overhead and fee once, and show the owner the unit math.
10 min read · Sep 12, 2026

How commercial contractors build a MasterFormat unit rate library: naming, includes/excludes, labor burden, waste, versioning, and overhead vs proposal.
12 min read · Aug 27, 2026

Most new company owners start by estimating materials, adding a desired paycheck, and calling it a bid. That approach quietly leaves overhead, labor risk, waste, contingency, and real profit uncovered—and the shortfall shows up months later as cash-flow pressure.
6 min read · Aug 20, 2026

What a commercial unit rate includes, how it differs from lump sum, and how GCs and subs turn a rate library into client-ready proposals.
10 min read · Aug 16, 2026

How commercial contractors price a job: scope, takeoff, loaded unit rates, overhead and fee, proposal terms, and tracking wins versus losses.
10 min read · Aug 16, 2026
How commercial electrical and low-voltage shops turn published unit rates into private libraries and client-ready proposals.
Short answers on unit rates, lump-sum vs unit-rate bidding, overhead, and getting started.
Build a unit rate library, send construction proposals with online acceptance, and track wins — with AI tools on every plan.