ACT heavy-duty slotted grid
$15.70 / LF
ACT-071 · MasterFormat 09 53 00 · LF
What’s in this rate
This unit is installing one linear foot of heavy-duty slotted ACT suspension grid, with tee share amortized along the run. The carpenter cuts, hangs, aligns, and levels the heavy-duty slotted grid. Tile, intermediate-duty and fire-rated grids, seismic bracing, fixtures, and penetrations are separate units.
Includes
- heavy-duty slotted grid section
- hanger and fastener allowance
- cut, hang, align, and level grid
- small tools
Excludes
- ceiling tile
- intermediate-duty grid
- fire-rated grid
- seismic engineering
- fixtures
- penetrations
Build-up
- Labor 0.135 hr × $55.00 wage and burden
- $7.42
- Material and small tools
- $5.55
- Direct rate (labor, material, and tools)
- $12.97 / LF
- Overhead 10% of direct
- $1.30
- Fee 10% of (direct and overhead)
- $1.43
- Loaded rate
- $15.70 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
