ACT intermediate-duty slotted grid

$14.57 / LF

ACT-076 · MasterFormat 09 53 00 · LF

What’s in this rate

This unit is installing one linear foot of intermediate-duty slotted ACT suspension grid, with tee share amortized along the run. The carpenter cuts, hangs, aligns, and levels the intermediate-duty slotted grid. Tile, heavy-duty and fire-rated grids, seismic bracing, fixtures, and penetrations are separate units.

Includes

  • intermediate-duty slotted grid section
  • hanger and fastener allowance
  • cut, hang, align, and level grid
  • small tools

Excludes

  • ceiling tile
  • heavy-duty slotted grid
  • fire-rated grid
  • seismic engineering
  • fixtures
  • penetrations

Build-up

Labor 0.128 hr × $55.00 wage and burden
$7.04
Material and small tools
$5.01
Direct rate (labor, material, and tools)
$12.05 / LF
Overhead 10% of direct
$1.20
Fee 10% of (direct and overhead)
$1.32
Loaded rate
$14.57 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.