ACT main tee replace
$11.53 / LF
ACT-013 · MasterFormat 09 53 00 · LF
What’s in this rate
This unit is replacing one linear foot of ACT main runner tee in an existing grid. The carpenter removes the damaged main tee, hangs the new runner, and reconnects cross tees. The rate is per linear foot of main tee. Cross tee replace, full grid rebuild, and tile are separate units.
Includes
- main runner tee with 5% waste
- hang wire / clip share
- remove, hang, and reconnect
- small tools
Excludes
- cross tee replace (buy act-cross-tee-replace)
- full grid rebuild (buy act-grid-15-16)
- tile
Build-up
- Labor 0.12 hr × $55.00 wage and burden
- $6.60
- Material and small tools
- $2.93
- Direct rate (labor, material, and tools)
- $9.53 / LF
- Overhead 10% of direct
- $0.95
- Fee 10% of (direct and overhead)
- $1.05
- Loaded rate
- $11.53 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
