ACT seismic compression post

$13.89 / EA

ACT-062 · MasterFormat 09 53 00 · EA

What’s in this rate

This unit is installing one ACT seismic compression post at a prepared grid location. The carpenter sets, plumbs, and fastens the post. Brace clips, rigid braces, splay wires, hangers, and engineering are separate units.

Includes

  • seismic compression post assembly
  • clip and fastener allowance
  • set, plumb, and fasten post
  • small tools

Excludes

  • seismic brace clip
  • rigid brace
  • splay wire
  • hanger wire
  • engineering

Build-up

Labor 0.13 hr × $55.00 wage and burden
$7.15
Material and small tools
$4.33
Direct rate (labor, material, and tools)
$11.48 / EA
Overhead 10% of direct
$1.15
Fee 10% of (direct and overhead)
$1.26
Loaded rate
$13.89 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.