Brick corbel
$40.70 / LF
MS-D-016 · MasterFormat 04 21 00 · LF
What’s in this rate
This unit covers Brick corbel, measured per linear foot. The bricklayer sets a projecting brick corbel course with controlled projection and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick water table, brick soldier course, brick header course, stone coping masonry are separate units.
Includes
- projecting brick corbel course
- mortar allocation
- projection control and tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- brick water table
- brick soldier course
- stone coping masonry
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.42 hr × $52.00 wage and burden
- $21.84
- Material and small tools
- $11.80
- Direct rate (labor, material, and tools)
- $33.64 / LF
- Overhead 10% of direct
- $3.36
- Fee 10% of (direct and overhead)
- $3.70
- Loaded rate
- $40.70 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
