English bond brick

$17.91 / SF

MS-D2-016 · MasterFormat 04 21 00 · SF

What’s in this rate

This unit covers English bond brick, measured per square foot. The bricklayer lays English-bond face brick with alternating stretcher and header courses. The rate covers the listed material, 5.00% material waste, labor, and small tools. Flemish bond brick, stack-bond brick veneer, brick header course, brick veneer running bond are separate units.

Includes

  • english bond brick pattern face brick
  • mortar allocation
  • layout and joint tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • running-bond brick veneer
  • other bond patterns as separate
  • paint-exterior-brick-acrylic
  • masonry wall tie
  • flashing / weeps
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.17 hr × $52.00 wage and burden
$8.84
Material and small tools
$5.96
Direct rate (labor, material, and tools)
$14.80 / SF
Overhead 10% of direct
$1.48
Fee 10% of (direct and overhead)
$1.63
Loaded rate
$17.91 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.