Brick rowlock course
$36.22 / LF
MS-D2-018 · MasterFormat 04 21 00 · LF
What’s in this rate
This unit covers Brick rowlock course, measured per linear foot. The bricklayer lays a mid-wall or band rowlock brick course with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick rowlock sill, brick sailor course, brick soldier course, brick header course, brick water table are separate units.
Includes
- rowlock-oriented face brick
- mortar allocation
- layout and tooling of rowlock band
- layout and installation described above
- stated material waste and small tools
Excludes
- brick-rowlock-sill
- brick sailor course
- brick soldier course
- brick header course
- field brick veneer
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.38 hr × $52.00 wage and burden
- $19.76
- Material and small tools
- $10.18
- Direct rate (labor, material, and tools)
- $29.94 / LF
- Overhead 10% of direct
- $2.99
- Fee 10% of (direct and overhead)
- $3.29
- Loaded rate
- $36.22 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
