Brick rowlock course

$36.22 / LF

MS-D2-018 · MasterFormat 04 21 00 · LF

What’s in this rate

This unit covers Brick rowlock course, measured per linear foot. The bricklayer lays a mid-wall or band rowlock brick course with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick rowlock sill, brick sailor course, brick soldier course, brick header course, brick water table are separate units.

Includes

  • rowlock-oriented face brick
  • mortar allocation
  • layout and tooling of rowlock band
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • brick-rowlock-sill
  • brick sailor course
  • brick soldier course
  • brick header course
  • field brick veneer
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.38 hr × $52.00 wage and burden
$19.76
Material and small tools
$10.18
Direct rate (labor, material, and tools)
$29.94 / LF
Overhead 10% of direct
$2.99
Fee 10% of (direct and overhead)
$3.29
Loaded rate
$36.22 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.