Brick soldier course

$34.01 / LF

Brick soldier course costs about $34.01 per linear foot installed. This is a published starting point and varies by region and job.

MS-019 · MasterFormat 04 21 00 · LF

What’s in this rate

This unit covers Brick soldier course, measured per linear foot. The bricklayer sets a soldier-course brick band with consistent alignment and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick veneer, brick header course, brick rowlock sill, brick water table are separate units.

Includes

  • soldier-oriented face brick
  • mortar allocation
  • layout and tooling of soldier band
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • field brick veneer
  • header course
  • rowlock sill
  • water table
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.35 hr × $55.00 wage and burden
$19.25
Material and small tools
$8.86
Direct rate (labor, material, and tools)
$28.11 / LF
Overhead 10% of direct
$2.81
Fee 10% of (direct and overhead)
$3.09
Loaded rate
$34.01 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.