Countersunk floor cleanout
$132.74 / EA
PL-151 · MasterFormat 22 13 00 · EA
What’s in this rate
This EA unit sets and connects one countersunk floor cleanout at an available DWV rough-in; the plumber establishes elevation, makes the connection, secures the plug, and aligns the cover. Branch piping, slab cutting, finish patching, access excavation, and two-way cleanouts are separate units.
Includes
- commercial countersunk floor-cleanout body and cover
- DWV connection and setting consumables
- set elevation, connect, secure plug, and align cover
Excludes
- DWV branch rough-in
- slab cutting or patching
- floor-finish repair
- excavation
- two-way cleanout
- after-hours work
Build-up
- Labor 0.55 hr × $72.00 wage and burden
- $39.60
- Material and small tools
- $70.10
- Direct rate (labor, material, and tools)
- $109.70 / EA
- Overhead 10% of direct
- $10.97
- Fee 10% of (direct and overhead)
- $12.07
- Loaded rate
- $132.74 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
