Drywall control joint

$8.25 / LF

DW-013 · MasterFormat 09 29 00 · LF

What’s in this rate

This unit is installing one linear foot of #093 zinc control joint in hung gypsum board to relieve expansion and contraction stress. The carpenter sets the joint, fastens flanges, and leaves protective tape until finish. Finish coats over the flanges are in the tape-and-finish unit.

Includes

  • #093 zinc control joint (10' sticks)
  • Fastener / staple attach
  • Cut and set
  • Small tools

Excludes

  • Level 4/5 finish coats beyond flange embed
  • Fire/sound seal behind joint
  • Reveal trim / aluminum architectural reveal

Build-up

Labor 0.1 hr × $55.00 wage and burden
$5.50
Material and small tools
$1.32
Direct rate (labor, material, and tools)
$6.82 / LF
Overhead 10% of direct
$0.68
Fee 10% of (direct and overhead)
$0.75
Loaded rate
$8.25 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.