Drip edge masonry
$11.69 / LF
MS-033 · MasterFormat 04 05 23 · LF
What’s in this rate
This unit covers Drip edge masonry, measured per linear foot. The bricklayer installs a masonry cavity drip edge at the flashing termination. The rate covers the listed material, 5.00% material waste, labor, and small tools. through-wall flashing masonry, drip-edge-metal-roof, CMU weep are separate units.
Includes
- masonry cavity drip edge
- attachment at flashing termination
- layout and installation described above
- stated material waste and small tools
Excludes
- drip-edge-metal-roof / roof-drip-edge-metal
- full through-wall flashing
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.1 hr × $52.00 wage and burden
- $5.20
- Material and small tools
- $4.46
- Direct rate (labor, material, and tools)
- $9.66 / LF
- Overhead 10% of direct
- $0.97
- Fee 10% of (direct and overhead)
- $1.06
- Loaded rate
- $11.69 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
