Drip edge masonry

$11.69 / LF

MS-033 · MasterFormat 04 05 23 · LF

What’s in this rate

This unit covers Drip edge masonry, measured per linear foot. The bricklayer installs a masonry cavity drip edge at the flashing termination. The rate covers the listed material, 5.00% material waste, labor, and small tools. through-wall flashing masonry, drip-edge-metal-roof, CMU weep are separate units.

Includes

  • masonry cavity drip edge
  • attachment at flashing termination
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • drip-edge-metal-roof / roof-drip-edge-metal
  • full through-wall flashing
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.1 hr × $52.00 wage and burden
$5.20
Material and small tools
$4.46
Direct rate (labor, material, and tools)
$9.66 / LF
Overhead 10% of direct
$0.97
Fee 10% of (direct and overhead)
$1.06
Loaded rate
$11.69 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.