5/8" glass-mat mold hang

$9.11 / SF

DW-115 · MasterFormat 09 29 00 · SF

What’s in this rate

This unit is hanging one square foot of 5/8" glass-mat mold-resistant gypsum board on prepared framing. The carpenter cuts, hangs, and screws the glass-mat board. Framing, Type C and abuse-resistant boards, tape and finish, and shaftwall are separate units.

Includes

  • 5/8" glass-mat mold-resistant gypsum board
  • screw and fastener allowance
  • cut, hang, and screw glass-mat board
  • small tools

Excludes

  • metal stud framing
  • Type C board
  • abuse-resistant board
  • tape and finish
  • shaftwall
  • primer and paint

Build-up

Labor 0.102 hr × $55.00 wage and burden
$5.61
Material and small tools
$1.92
Direct rate (labor, material, and tools)
$7.53 / SF
Overhead 10% of direct
$0.75
Fee 10% of (direct and overhead)
$0.83
Loaded rate
$9.11 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.