5/8" glass-mat mold hang
$9.11 / SF
DW-115 · MasterFormat 09 29 00 · SF
What’s in this rate
This unit is hanging one square foot of 5/8" glass-mat mold-resistant gypsum board on prepared framing. The carpenter cuts, hangs, and screws the glass-mat board. Framing, Type C and abuse-resistant boards, tape and finish, and shaftwall are separate units.
Includes
- 5/8" glass-mat mold-resistant gypsum board
- screw and fastener allowance
- cut, hang, and screw glass-mat board
- small tools
Excludes
- metal stud framing
- Type C board
- abuse-resistant board
- tape and finish
- shaftwall
- primer and paint
Build-up
- Labor 0.102 hr × $55.00 wage and burden
- $5.61
- Material and small tools
- $1.92
- Direct rate (labor, material, and tools)
- $7.53 / SF
- Overhead 10% of direct
- $0.75
- Fee 10% of (direct and overhead)
- $0.83
- Loaded rate
- $9.11 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
