5/8" soundboard hang

$5.40 / SF

DW-046 · MasterFormat 09 29 00 · SF

What’s in this rate

This unit is hanging one square foot of 5/8-inch soundboard on prepared commercial framing. The carpenter cuts, lifts, and screw-attaches the board. The rate is per square foot of board face. Resilient channel, acoustic sealant, framing, and tape-and-finish are separate units.

Includes

  • 5/8-inch soundboard with 10% waste
  • fine-thread drywall screws
  • cut, hang, and screw to prepared framing
  • small tools

Excludes

  • acoustic sealant; resilient channel; framing; tape; finish; after-hours

Build-up

Labor 0.065 hr × $55.00 wage and burden
$3.58
Material and small tools
$0.88
Direct rate (labor, material, and tools)
$4.46 / SF
Overhead 10% of direct
$0.45
Fee 10% of (direct and overhead)
$0.49
Loaded rate
$5.40 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.