U-bead trim
$6.01 / LF
DW-049 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of U-bead trim on prepared commercial gypsum. The carpenter cuts, sets, and secures the trim ready for finish coats. Tape-and-finish, J/L bead, L-bead reveal, shadow bead, and framing are separate units.
Includes
- U-bead trim with 5% waste
- cut, set, and secure trim
- small tools
Excludes
- tape and finish; J-bead; L-bead; shadow bead; framing; after-hours
Build-up
- Labor 0.07 hr × $55.00 wage and burden
- $3.85
- Material and small tools
- $1.11
- Direct rate (labor, material, and tools)
- $4.96 / LF
- Overhead 10% of direct
- $0.50
- Fee 10% of (direct and overhead)
- $0.55
- Loaded rate
- $6.01 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
