Vinyl U-bead
$6.34 / LF
DW-104 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of vinyl U-bead on a prepared gypsum edge. The carpenter cuts, sets, and secures the bead ready for finish work. Paper-faced bullnose, J-bead, L-bead, and gypsum hang are separate units.
Includes
- vinyl U-bead
- fastener and mud-set allowance
- cut, set, and secure bead
- small tools
Excludes
- gypsum hang
- tape and finish
- paper-faced bullnose
- J-bead
- L-bead
- primer and paint
Build-up
- Labor 0.07 hr × $55.00 wage and burden
- $3.85
- Material and small tools
- $1.39
- Direct rate (labor, material, and tools)
- $5.24 / LF
- Overhead 10% of direct
- $0.52
- Fee 10% of (direct and overhead)
- $0.58
- Loaded rate
- $6.34 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
