Novolac chemical epoxy floor

$21.74 / SF

Novolac chemical epoxy floor costs about $21.74 per square foot installed. This is a published starting point and varies by region and job.

FL-200 · MasterFormat 09 67 00 · SF

What’s in this rate

This SF unit places a novolac chemical-resistant epoxy floor system over a prepared slab; the crew primes, mixes, places, and finishes the chemical-resistant field. Urethane-cement mortar, metallic epoxy, quartz broadcast, flake systems, self-leveling epoxy, and concrete repair are separate units.

Includes

  • novolac chemical-resistant epoxy system
  • primer and mixing consumables
  • prime, mix, place, and finish chemical-resistant field

Excludes

  • urethane-cement epoxy mortar
  • metallic epoxy topcoat
  • quartz broadcast basecoat
  • flake basecoat or topcoat
  • self-leveling epoxy
  • concrete grinding or repair
  • after-hours work

Build-up

Labor 0.135 hr × $51.00 wage and burden
$6.88
Material and small tools
$11.09
Direct rate (labor, material, and tools)
$17.97 / SF
Overhead 10% of direct
$1.80
Fee 10% of (direct and overhead)
$1.97
Loaded rate
$21.74 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.