Novolac chemical epoxy floor
$21.74 / SF
Novolac chemical epoxy floor costs about $21.74 per square foot installed. This is a published starting point and varies by region and job.
FL-200 · MasterFormat 09 67 00 · SF
What’s in this rate
This SF unit places a novolac chemical-resistant epoxy floor system over a prepared slab; the crew primes, mixes, places, and finishes the chemical-resistant field. Urethane-cement mortar, metallic epoxy, quartz broadcast, flake systems, self-leveling epoxy, and concrete repair are separate units.
Includes
- novolac chemical-resistant epoxy system
- primer and mixing consumables
- prime, mix, place, and finish chemical-resistant field
Excludes
- urethane-cement epoxy mortar
- metallic epoxy topcoat
- quartz broadcast basecoat
- flake basecoat or topcoat
- self-leveling epoxy
- concrete grinding or repair
- after-hours work
Build-up
- Labor 0.135 hr × $51.00 wage and burden
- $6.88
- Material and small tools
- $11.09
- Direct rate (labor, material, and tools)
- $17.97 / SF
- Overhead 10% of direct
- $1.80
- Fee 10% of (direct and overhead)
- $1.97
- Loaded rate
- $21.74 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
