Polyaspartic epoxy topcoat floor
$18.83 / SF
Polyaspartic epoxy topcoat floor costs about $18.83 per square foot installed. This is a published starting point and varies by region and job.
FL-215 · MasterFormat 09 67 00 · SF
What’s in this rate
This SF unit places a polyaspartic epoxy topcoat floor system over a prepared slab; the crew primes, mixes, places, and finishes the topcoat field. Novolac chemical epoxy, urethane-cement mortar, metallic epoxy, quartz broadcast, flake systems, self-leveling epoxy, and concrete repair are separate units.
Includes
- polyaspartic epoxy topcoat system
- primer and mixing consumables
- prime, mix, place, and finish topcoat field
Excludes
- novolac chemical epoxy floor
- urethane-cement epoxy mortar
- metallic epoxy
- quartz broadcast epoxy
- flake epoxy system
- self-leveling epoxy
- concrete repair
- after-hours work
Build-up
- Labor 0.1 hr × $51.00 wage and burden
- $5.10
- Material and small tools
- $10.46
- Direct rate (labor, material, and tools)
- $15.56 / SF
- Overhead 10% of direct
- $1.56
- Fee 10% of (direct and overhead)
- $1.71
- Loaded rate
- $18.83 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
