Epoxy self-level floor

$11.86 / SF

FL-056 · MasterFormat 09 67 00 · SF

What’s in this rate

This unit is installing one square foot of self-leveling epoxy floor. The installer primes, pours, and finishes the self-level epoxy. The rate is per square foot of finished floor. Epoxy flake broadcast, quartz broadcast, and conductive epoxy are separate units.

Includes

  • self-leveling epoxy system
  • primer share
  • pour and finish
  • small tools

Excludes

  • epoxy flake broadcast (see epoxy-flake-broadcast-floor)
  • epoxy quartz broadcast
  • conductive epoxy floor
  • moisture mitigation beyond primer

Build-up

Labor 0.1 hr × $55.00 wage and burden
$5.50
Material and small tools
$4.30
Direct rate (labor, material, and tools)
$9.80 / SF
Overhead 10% of direct
$0.98
Fee 10% of (direct and overhead)
$1.08
Loaded rate
$11.86 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.