EZ-Path 22 firestop pathway

$174.35 / EA

LV-169 · MasterFormat 07 84 00 · EA

What’s in this rate

This unit is installing one STI EZ-Path Series 22 firestop pathway. The technician sets the pathway through an existing wall opening and fastens the wall plates. The rate is per pathway. Core drilling, cable fill, and other firestop methods are separate units.

Includes

  • STI EZ-Path Series 22 firestop pathway
  • wall plates
  • set in existing opening

Excludes

  • core drilling
  • cable
  • other firestop methods

Build-up

Labor 0.6 hr × $60.00 wage and burden
$36.00
STIEZD22
Platt retail list
Material and small tools
$108.09
Direct rate (labor, material, and tools)
$144.09 / EA
Overhead 10% of direct
$14.41
Fee 10% of (direct and overhead)
$15.85
Loaded rate
$174.35 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.