Crack isolation membrane
$9.17 / SF
FL-102 · MasterFormat 09 05 00 · SF
What’s in this rate
Install a crack-isolation membrane under floor finish over prepared substrate, including seams and terminations.
Includes
- crack-isolation membrane
- compatible setting materials
- layout/cut/install
- seam/termination treatment
Excludes
- moisture-mitigation primer
- floor-moisture-mitigation
- floor-epoxy-moisture-barrier
- resilient finish floor
Build-up
- Labor 0.065 hr × $55.00 wage and burden
- $3.58
- Material and small tools
- $4.00
- Direct rate (labor, material, and tools)
- $7.58 / SF
- Overhead 10% of direct
- $0.76
- Fee 10% of (direct and overhead)
- $0.83
- Loaded rate
- $9.17 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
