Cast-iron floor drain
$384.90 / EA
PL-003 · MasterFormat 22 13 19 · EA
What’s in this rate
This unit is setting one cast-iron floor drain to finished-floor elevation and connecting it to the prepared waste rough-in. The plumber sets the body, lands the strainer, and leaves the drain ready. The rate is per drain. Waste piping billed by the foot, trench drains, and roof drains are separate units.
Includes
- Cast-iron floor drain body and strainer
- Set to finished floor elevation
- Connect to the waste rough-in
- Small tools
Excludes
- Waste piping billed by the linear foot
- Trench drain
- Roof drain
Build-up
- Labor 2 hr × $72.00 wage and burden
- $144.00
- Material and small tools
- $174.10
- Direct rate (labor, material, and tools)
- $318.10 / EA
- Overhead 10% of direct
- $31.81
- Fee 10% of (direct and overhead)
- $34.99
- Loaded rate
- $384.90 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
