Hub drain
$223.97 / EA
PL-018 · MasterFormat 22 13 00 · EA
What’s in this rate
This unit is setting one hub drain receptor and connecting it to the waste branch. The plumber sets the hub, couples to the pipe, and leaves it ready for equipment drain. The rate is per each hub drain. Floor sinks, floor drains, and trap primers are separate units.
Includes
- hub drain receptor mid
- coupling connect allowance
- set and level
- small tools
Excludes
- floor sink (see floor-sink)
- floor drain (see floor-drain-cast-iron)
- trap primer
Build-up
- Labor 1.25 hr × $72.00 wage and burden
- $90.00
- Material and small tools
- $95.10
- Direct rate (labor, material, and tools)
- $185.10 / EA
- Overhead 10% of direct
- $18.51
- Fee 10% of (direct and overhead)
- $20.36
- Loaded rate
- $223.97 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
