Joist field reinforcement
$36.25 / LF
SS-D3-006 · MasterFormat 05 21 00 · LF
What’s in this rate
This unit covers Joist field reinforcement, measured per linear foot. The ironworker field-welds angle or rod reinforcement to an existing joist chord or web to carry added load. The rate covers the listed material, 5.00% material waste, labor, and small tools. Joist install, engineering/joist-supplier design, RTU subframes, and deck work are separate units.
Includes
- reinforcing angle / rod
- weld metal / consumables
- layout and installation described above
- stated material waste and small tools
Excludes
- open-web-steel-joist-* install
- engineering / joist manufacturer analysis
- steel-rtu-support-frame
- fire watch / hot-work permit costs
- NDT
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.35 hr × $58.00 wage and burden
- $20.30
- Material and small tools
- $9.65
- Direct rate (labor, material, and tools)
- $29.95 / LF
- Overhead 10% of direct
- $3.00
- Fee 10% of (direct and overhead)
- $3.30
- Loaded rate
- $36.25 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
