Joist field reinforcement

$36.25 / LF

SS-D3-006 · MasterFormat 05 21 00 · LF

What’s in this rate

This unit covers Joist field reinforcement, measured per linear foot. The ironworker field-welds angle or rod reinforcement to an existing joist chord or web to carry added load. The rate covers the listed material, 5.00% material waste, labor, and small tools. Joist install, engineering/joist-supplier design, RTU subframes, and deck work are separate units.

Includes

  • reinforcing angle / rod
  • weld metal / consumables
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • open-web-steel-joist-* install
  • engineering / joist manufacturer analysis
  • steel-rtu-support-frame
  • fire watch / hot-work permit costs
  • NDT
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.35 hr × $58.00 wage and burden
$20.30
Material and small tools
$9.65
Direct rate (labor, material, and tools)
$29.95 / LF
Overhead 10% of direct
$3.00
Fee 10% of (direct and overhead)
$3.30
Loaded rate
$36.25 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.