Masonry control joint gasket
$8.88 / LF
MS-036 · MasterFormat 04 05 23 · LF
What’s in this rate
This unit covers Masonry control joint gasket, measured per linear foot. The bricklayer places premolded control-joint gasket in the masonry control joint. The rate covers the listed material, 5.00% material waste, labor, and small tools. control joint in CMU, brick expansion joint are separate units.
Includes
- premolded control-joint gasket
- placement in masonry control joint
- layout and installation described above
- stated material waste and small tools
Excludes
- CMU control joint cut/slot labor densify (MS-012)
- brick expansion joint sealant systems
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.08 hr × $52.00 wage and burden
- $4.16
- Material and small tools
- $3.18
- Direct rate (labor, material, and tools)
- $7.34 / LF
- Overhead 10% of direct
- $0.73
- Fee 10% of (direct and overhead)
- $0.81
- Loaded rate
- $8.88 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
