Masonry control joint gasket

$8.88 / LF

MS-036 · MasterFormat 04 05 23 · LF

What’s in this rate

This unit covers Masonry control joint gasket, measured per linear foot. The bricklayer places premolded control-joint gasket in the masonry control joint. The rate covers the listed material, 5.00% material waste, labor, and small tools. control joint in CMU, brick expansion joint are separate units.

Includes

  • premolded control-joint gasket
  • placement in masonry control joint
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • CMU control joint cut/slot labor densify (MS-012)
  • brick expansion joint sealant systems
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.08 hr × $52.00 wage and burden
$4.16
Material and small tools
$3.18
Direct rate (labor, material, and tools)
$7.34 / LF
Overhead 10% of direct
$0.73
Fee 10% of (direct and overhead)
$0.81
Loaded rate
$8.88 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.