Masonry curtain-wall buck
$149.13 / EA
MS-D3-031 · MasterFormat 04 05 23 · EA
What’s in this rate
This unit covers Masonry curtain-wall buck, measured per each. The bricklayer builds the masonry buck for a curtain-wall opening. The rate covers the listed material, 5.00% material waste, labor, and small tools. masonry storefront buck, masonry door buck, masonry window buck, masonry louver buck are separate units.
Includes
- masonry buck / frame / flashing materials as specified
- layout and installation described above
- stated material waste and small tools
Excludes
- storefront / door / window / louver bucks
- curtain-wall system
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 1.8 hr × $52.00 wage and burden
- $93.60
- Material and small tools
- $29.65
- Direct rate (labor, material, and tools)
- $123.25 / EA
- Overhead 10% of direct
- $12.32
- Fee 10% of (direct and overhead)
- $13.56
- Loaded rate
- $149.13 / EA
Related rates