Masonry pointing mortar

$29.81 / CF

MS-D3-020 · MasterFormat 04 05 13 · CF

What’s in this rate

This unit covers Masonry pointing mortar, measured per cubic foot. The bricklayer mixes and places pointing mortar for masonry joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. tuckpoint masonry, full brick repointing, Type N / Type O mortar CF are separate units.

Includes

  • specified mortar or grout / flashing / weep material
  • mixing and placement described above
  • stated material waste and small tools

Excludes

  • tuckpoint labor SF
  • full brick repointing SF
  • Type N/O mortar CF field
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.28 hr × $52.00 wage and burden
$14.56
Material and small tools
$10.08
Direct rate (labor, material, and tools)
$24.64 / CF
Overhead 10% of direct
$2.46
Fee 10% of (direct and overhead)
$2.71
Loaded rate
$29.81 / CF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.