Metal stud partition 14ga

$16.41 / LF

DW-066 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is framing one linear foot of 14-gauge metal stud partition, with track and studs amortized along the wall run. The carpenter cuts and fastens the framing ready for hang. Deflection track, kickers, backing, door frames, and board hang are separate units.

Includes

  • 14-gauge studs and track with 5% waste plus fasteners
  • cut, set track, and install studs
  • small tools

Excludes

  • drywall hang
  • deflection track
  • kickers
  • backing
  • door frames
  • engineering

Build-up

Labor 0.15 hr × $55.00 wage and burden
$8.25
Material and small tools
$5.31
Direct rate (labor, material, and tools)
$13.56 / LF
Overhead 10% of direct
$1.36
Fee 10% of (direct and overhead)
$1.49
Loaded rate
$16.41 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.