Metal stud flat bridging

$10.00 / LF

DW-107 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of flat bridging on prepared metal-stud framing. The carpenter cuts, aligns, and fastens the bridging. Kicker braces, resilient channel, box headers, and drywall hang are separate units.

Includes

  • flat bridging channel and clip
  • screw and fastener allowance
  • cut, align, and fasten flat bridging
  • small tools

Excludes

  • metal studs
  • kicker brace
  • resilient channel
  • box header
  • drywall hang
  • engineering

Build-up

Labor 0.105 hr × $55.00 wage and burden
$5.78
Material and small tools
$2.48
Direct rate (labor, material, and tools)
$8.26 / LF
Overhead 10% of direct
$0.83
Fee 10% of (direct and overhead)
$0.91
Loaded rate
$10.00 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.