Metal stud flat bridging
$10.00 / LF
DW-107 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of flat bridging on prepared metal-stud framing. The carpenter cuts, aligns, and fastens the bridging. Kicker braces, resilient channel, box headers, and drywall hang are separate units.
Includes
- flat bridging channel and clip
- screw and fastener allowance
- cut, align, and fasten flat bridging
- small tools
Excludes
- metal studs
- kicker brace
- resilient channel
- box header
- drywall hang
- engineering
Build-up
- Labor 0.105 hr × $55.00 wage and burden
- $5.78
- Material and small tools
- $2.48
- Direct rate (labor, material, and tools)
- $8.26 / LF
- Overhead 10% of direct
- $0.83
- Fee 10% of (direct and overhead)
- $0.91
- Loaded rate
- $10.00 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
