Metal stud hat-channel bridging
$11.67 / LF
DW-121 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of hat-channel bridging on prepared metal-stud framing. The carpenter cuts, aligns, and fastens the hat-channel bridging. Solid bridging, flat bridging, kicker braces, resilient channel, and drywall hang are separate units.
Includes
- hat-channel bridging and clip
- screw and fastener allowance
- cut, align, and fasten hat-channel bridging
- small tools
Excludes
- metal studs
- solid bridging
- flat bridging
- kicker brace
- resilient channel
- drywall hang
Build-up
- Labor 0.12 hr × $55.00 wage and burden
- $6.60
- Material and small tools
- $3.05
- Direct rate (labor, material, and tools)
- $9.65 / LF
- Overhead 10% of direct
- $0.96
- Fee 10% of (direct and overhead)
- $1.06
- Loaded rate
- $11.67 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
