Metal stud hat-channel bridging

$11.67 / LF

DW-121 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of hat-channel bridging on prepared metal-stud framing. The carpenter cuts, aligns, and fastens the hat-channel bridging. Solid bridging, flat bridging, kicker braces, resilient channel, and drywall hang are separate units.

Includes

  • hat-channel bridging and clip
  • screw and fastener allowance
  • cut, align, and fasten hat-channel bridging
  • small tools

Excludes

  • metal studs
  • solid bridging
  • flat bridging
  • kicker brace
  • resilient channel
  • drywall hang

Build-up

Labor 0.12 hr × $55.00 wage and burden
$6.60
Material and small tools
$3.05
Direct rate (labor, material, and tools)
$9.65 / LF
Overhead 10% of direct
$0.96
Fee 10% of (direct and overhead)
$1.06
Loaded rate
$11.67 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.