Metal stud framing wall
$7.82 / SF
DW-001 · MasterFormat 09 22 16 · SF
What’s in this rate
This unit is framing one square foot of interior partition with 3-5/8 inch 25-gauge metal studs at 16 inches on center and matching track at floor and deck. The carpenter cuts, plumbs, and screws the studs and track ready for board. The rate is per square foot of wall face (one side of a typical 10-foot-high partition). Drywall hang, insulation, and openings are separate units.
Includes
- 3-5/8" 25ga EQ metal studs @ 16" OC
- Matching track top and bottom
- Framing fasteners
- Layout, plumb, and screw
- Small tools
Excludes
- Drywall hang or finish
- Insulation / sound batts
- Door or window framing extras beyond stud/track count
- Seismic or shaft-wall systems
Build-up
- Labor 0.1 hr × $55.00 wage and burden
- $5.50
- Material and small tools
- $0.96
- Direct rate (labor, material, and tools)
- $6.46 / SF
- Overhead 10% of direct
- $0.65
- Fee 10% of (direct and overhead)
- $0.71
- Loaded rate
- $7.82 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
