Metal stud king header
$16.02 / LF
DW-063 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is framing one linear foot of metal-stud king/header reinforcement at a prepared opening. The carpenter cuts and fastens the king and header stud assembly ready for board and opening work. Door frames, lintels, backing, and drywall hang are separate units.
Includes
- king/header studs and track with 5% waste plus fasteners
- cut and fasten opening reinforcement
- small tools
Excludes
- door frame
- masonry lintel
- backing
- drywall hang
- engineering
- embeds
Build-up
- Labor 0.15 hr × $55.00 wage and burden
- $8.25
- Material and small tools
- $4.99
- Direct rate (labor, material, and tools)
- $13.24 / LF
- Overhead 10% of direct
- $1.32
- Fee 10% of (direct and overhead)
- $1.46
- Loaded rate
- $16.02 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
