Metal stud king header

$16.02 / LF

DW-063 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is framing one linear foot of metal-stud king/header reinforcement at a prepared opening. The carpenter cuts and fastens the king and header stud assembly ready for board and opening work. Door frames, lintels, backing, and drywall hang are separate units.

Includes

  • king/header studs and track with 5% waste plus fasteners
  • cut and fasten opening reinforcement
  • small tools

Excludes

  • door frame
  • masonry lintel
  • backing
  • drywall hang
  • engineering
  • embeds

Build-up

Labor 0.15 hr × $55.00 wage and burden
$8.25
Material and small tools
$4.99
Direct rate (labor, material, and tools)
$13.24 / LF
Overhead 10% of direct
$1.32
Fee 10% of (direct and overhead)
$1.46
Loaded rate
$16.02 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.