Metal stud resilient channel
$9.64 / LF
DW-093 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of resilient channel on prepared metal-stud framing. The carpenter cuts, aligns, and fastens the channel. Studs, box headers, bridging, kickers, drywall hang, and acoustic testing are separate units.
Includes
- resilient channel section
- screws and fasteners
- cut, align, and fasten channel
- small tools
Excludes
- metal studs
- box header
- bridging
- kickers
- drywall hang
- acoustic testing
Build-up
- Labor 0.1 hr × $55.00 wage and burden
- $5.50
- Material and small tools
- $2.46
- Direct rate (labor, material, and tools)
- $7.96 / LF
- Overhead 10% of direct
- $0.80
- Fee 10% of (direct and overhead)
- $0.88
- Loaded rate
- $9.64 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
