Metal stud resilient channel

$9.64 / LF

DW-093 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of resilient channel on prepared metal-stud framing. The carpenter cuts, aligns, and fastens the channel. Studs, box headers, bridging, kickers, drywall hang, and acoustic testing are separate units.

Includes

  • resilient channel section
  • screws and fasteners
  • cut, align, and fasten channel
  • small tools

Excludes

  • metal studs
  • box header
  • bridging
  • kickers
  • drywall hang
  • acoustic testing

Build-up

Labor 0.1 hr × $55.00 wage and burden
$5.50
Material and small tools
$2.46
Direct rate (labor, material, and tools)
$7.96 / LF
Overhead 10% of direct
$0.80
Fee 10% of (direct and overhead)
$0.88
Loaded rate
$9.64 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.