Metal flush reducer transition
$13.89 / LF
FL-221 · MasterFormat 09 65 00 · LF
What’s in this rate
This LF unit installs one metal flush reducer transition between dissimilar floor finishes; the crew cuts, aligns, fastens, and seats the strip. End-cap ramp transitions, reducer ramp transitions, Z-bar, T-bar, Schluter-profile, and vinyl reducer transitions are separate units.
Includes
- metal flush reducer transition strip
- fasteners and adhesive share
- cut, align, fasten, and seat
Excludes
- metal end-cap ramp transition
- metal reducer ramp transition
- Z-bar transition
- T-bar transition
- Schluter-profile transition
- vinyl reducer transition
- after-hours work
Build-up
- Labor 0.105 hr × $55.00 wage and burden
- $5.78
- Material and small tools
- $5.70
- Direct rate (labor, material, and tools)
- $11.48 / LF
- Overhead 10% of direct
- $1.15
- Fee 10% of (direct and overhead)
- $1.26
- Loaded rate
- $13.89 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
