Metal flush reducer transition

$13.89 / LF

FL-221 · MasterFormat 09 65 00 · LF

What’s in this rate

This LF unit installs one metal flush reducer transition between dissimilar floor finishes; the crew cuts, aligns, fastens, and seats the strip. End-cap ramp transitions, reducer ramp transitions, Z-bar, T-bar, Schluter-profile, and vinyl reducer transitions are separate units.

Includes

  • metal flush reducer transition strip
  • fasteners and adhesive share
  • cut, align, fasten, and seat

Excludes

  • metal end-cap ramp transition
  • metal reducer ramp transition
  • Z-bar transition
  • T-bar transition
  • Schluter-profile transition
  • vinyl reducer transition
  • after-hours work

Build-up

Labor 0.105 hr × $55.00 wage and burden
$5.78
Material and small tools
$5.70
Direct rate (labor, material, and tools)
$11.48 / LF
Overhead 10% of direct
$1.15
Fee 10% of (direct and overhead)
$1.26
Loaded rate
$13.89 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.