Mineral-wool fire safing

$13.87 / LF

IN-003 · MasterFormat 07 84 13 · LF

What’s in this rate

This unit is packing one linear foot of mineral-wool fire safing into a rated joint or head-of-wall gap. The carpenter cuts the safing, compresses it into the opening, and leaves it ready for sealant if the specification calls for a separate firestop unit. The rate is per linear foot. Sealant, collars, and full-bay batt fill are separate.

Includes

  • Mineral-wool safing packed to the joint
  • Cut and compress
  • Small tools

Excludes

  • Firestop sealant or collar
  • Batt fill in the full stud bay
  • Rated shaft-wall assembly

Build-up

Labor 0.12 hr × $55.00 wage and burden
$6.60
Material and small tools
$4.86
Direct rate (labor, material, and tools)
$11.46 / LF
Overhead 10% of direct
$1.15
Fee 10% of (direct and overhead)
$1.26
Loaded rate
$13.87 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.