Mineral-wool fire safing
$13.87 / LF
IN-003 · MasterFormat 07 84 13 · LF
What’s in this rate
This unit is packing one linear foot of mineral-wool fire safing into a rated joint or head-of-wall gap. The carpenter cuts the safing, compresses it into the opening, and leaves it ready for sealant if the specification calls for a separate firestop unit. The rate is per linear foot. Sealant, collars, and full-bay batt fill are separate.
Includes
- Mineral-wool safing packed to the joint
- Cut and compress
- Small tools
Excludes
- Firestop sealant or collar
- Batt fill in the full stud bay
- Rated shaft-wall assembly
Build-up
- Labor 0.12 hr × $55.00 wage and burden
- $6.60
- Material and small tools
- $4.86
- Direct rate (labor, material, and tools)
- $11.46 / LF
- Overhead 10% of direct
- $1.15
- Fee 10% of (direct and overhead)
- $1.26
- Loaded rate
- $13.87 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
