Bollard safety orange

$31.63 / EA

PT-157 · MasterFormat 09 91 00 · EA

What’s in this rate

This unit covers Bollard safety orange, measured per each. The painter cleans and masks the bollard, applies the safety-orange finish, and removes masking. The rate covers the listed material, 10.00% material waste, labor, and small tools. Bollard installation, extensive rust removal, primer, concrete base coating, access equipment, removals are separate units.

Includes

  • safety-orange industrial enamel for one standard exposed bollard
  • layout, ordinary surface preparation, and coating application described above
  • stated material waste and small tools

Excludes

  • bollard installation
  • extensive rust removal
  • primer
  • concrete base coating
  • access equipment
  • removals
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.45 hr × $42.00 wage and burden
$18.90
Material and small tools
$7.24
Direct rate (labor, material, and tools)
$26.14 / EA
Overhead 10% of direct
$2.61
Fee 10% of (direct and overhead)
$2.88
Loaded rate
$31.63 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.