CMU silicate finish

$3.78 / SF

PT-173 · MasterFormat 09 91 00 · SF

What’s in this rate

This unit covers CMU silicate finish, measured per square foot. The painter cleans the block face, cuts in edges, and rolls or sprays a mineral silicate finish coat. The rate covers the listed material, 10.00% material waste, labor, and small tools. Elastomeric finish, epoxy finish, acrylic finish, siloxane sealer, block fill, primer, removals are separate units.

Includes

  • mineral silicate finish coating for CMU
  • layout, ordinary surface preparation, and coating application described above
  • stated material waste and small tools

Excludes

  • elastomeric finish
  • epoxy finish
  • acrylic finish
  • siloxane sealer
  • block fill
  • primer
  • removals
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.05 hr × $42.00 wage and burden
$2.10
Material and small tools
$1.03
Direct rate (labor, material, and tools)
$3.13 / SF
Overhead 10% of direct
$0.31
Fee 10% of (direct and overhead)
$0.34
Loaded rate
$3.78 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.