Floor aisle arrow
$2.93 / LF
PT-176 · MasterFormat 09 91 00 · LF
What’s in this rate
This unit covers Floor aisle arrow, measured per linear foot. The painter layouts the arrow, masks edges, applies marking paint, and removes masking. The rate covers the listed material, 10.00% material waste, labor, and small tools. Warehouse hash stripes, loading-zone markings, crosshatch stripes, stop bars, surface prep beyond cleaning, removals are separate units.
Includes
- traffic-marking paint for aisle directional arrows
- layout, ordinary surface preparation, and coating application described above
- stated material waste and small tools
Excludes
- warehouse hash stripes
- loading-zone markings
- crosshatch stripes
- stop bars
- surface prep beyond cleaning
- removals
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.04 hr × $42.00 wage and burden
- $1.68
- Material and small tools
- $0.74
- Direct rate (labor, material, and tools)
- $2.42 / LF
- Overhead 10% of direct
- $0.24
- Fee 10% of (direct and overhead)
- $0.27
- Loaded rate
- $2.93 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
