Floor aisle chevron
$3.09 / LF
PT-209 · MasterFormat 09 91 00 · LF
What’s in this rate
This unit covers Floor aisle chevron, measured per linear foot. The painter layouts the aisle chevron pattern, masks edges, and rolls or sprays the chevron marking. The rate covers the listed material, 10.00% material waste, labor, and small tools. aisle arrow, fire-lane hash, loading-zone arrow, crosswalk bar, stop bar, parking-stall hash are separate units.
Includes
- aisle chevron marking paint for floors
- layout, ordinary surface preparation, and coating application described above
- stated material waste and small tools
Excludes
- aisle arrow
- fire-lane hash
- loading-zone arrow
- crosswalk bar
- stop bar
- parking-stall hash
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.042 hr × $42.00 wage and burden
- $1.76
- Material and small tools
- $0.79
- Direct rate (labor, material, and tools)
- $2.55 / LF
- Overhead 10% of direct
- $0.26
- Fee 10% of (direct and overhead)
- $0.28
- Loaded rate
- $3.09 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
