Floor crosswalk bar
$2.63 / LF
PT-179 · MasterFormat 09 91 00 · LF
What’s in this rate
This unit covers Floor crosswalk bar, measured per linear foot. The painter layouts the bar, masks edges, applies marking paint, and removes masking. The rate covers the listed material, 10.00% material waste, labor, and small tools. Stop bars, parking hash stripes, stall lines, fire-lane markings, surface prep beyond cleaning, removals are separate units.
Includes
- traffic-marking paint for floor crosswalk bars
- layout, ordinary surface preparation, and coating application described above
- stated material waste and small tools
Excludes
- stop bars
- parking hash stripes
- stall lines
- fire-lane markings
- surface prep beyond cleaning
- removals
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.035 hr × $42.00 wage and burden
- $1.47
- Material and small tools
- $0.70
- Direct rate (labor, material, and tools)
- $2.17 / LF
- Overhead 10% of direct
- $0.22
- Fee 10% of (direct and overhead)
- $0.24
- Loaded rate
- $2.63 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
