Floor dock chevron

$3.28 / LF

PT-224 · MasterFormat 09 91 00 · LF

What’s in this rate

This unit covers Floor dock chevron, measured per linear foot. The painter layouts the dock chevron pattern, masks edges, applies traffic paint, and removes masking. The rate covers the listed material, 5.00% material waste, labor, and small tools. aisle chevron, aisle arrow, fire-lane marking, loading arrow, crosswalk marking, stop bar are separate units.

Includes

  • floor traffic paint for dock chevron marking with masking allocation
  • layout, ordinary surface preparation, and installation described above
  • stated material waste and small tools

Excludes

  • aisle chevron
  • aisle arrow
  • fire-lane marking
  • loading arrow
  • crosswalk marking
  • stop bar
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.045 hr × $42.00 wage and burden
$1.89
Material and small tools
$0.82
Direct rate (labor, material, and tools)
$2.71 / LF
Overhead 10% of direct
$0.27
Fee 10% of (direct and overhead)
$0.30
Loaded rate
$3.28 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.