Floor fire-lane hash
$3.29 / LF
PT-191 · MasterFormat 09 91 00 · LF
What’s in this rate
This unit covers Floor fire-lane hash, measured per linear foot. The painter layouts the fire-lane hash pattern, masks edges, and rolls or sprays the hash marking. The rate covers the listed material, 10.00% material waste, labor, and small tools. aisle arrow, warehouse hash, loading-zone marking, crosswalk bar, stop bar, parking hash are separate units.
Includes
- fire-lane hash marking paint for floors
- layout, ordinary surface preparation, and coating application described above
- stated material waste and small tools
Excludes
- aisle arrow
- warehouse hash
- loading-zone marking
- crosswalk bar
- stop bar
- parking hash
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.045 hr × $42.00 wage and burden
- $1.89
- Material and small tools
- $0.83
- Direct rate (labor, material, and tools)
- $2.72 / LF
- Overhead 10% of direct
- $0.27
- Fee 10% of (direct and overhead)
- $0.30
- Loaded rate
- $3.29 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
