Floor fire-lane hash

$3.29 / LF

PT-191 · MasterFormat 09 91 00 · LF

What’s in this rate

This unit covers Floor fire-lane hash, measured per linear foot. The painter layouts the fire-lane hash pattern, masks edges, and rolls or sprays the hash marking. The rate covers the listed material, 10.00% material waste, labor, and small tools. aisle arrow, warehouse hash, loading-zone marking, crosswalk bar, stop bar, parking hash are separate units.

Includes

  • fire-lane hash marking paint for floors
  • layout, ordinary surface preparation, and coating application described above
  • stated material waste and small tools

Excludes

  • aisle arrow
  • warehouse hash
  • loading-zone marking
  • crosswalk bar
  • stop bar
  • parking hash
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.045 hr × $42.00 wage and burden
$1.89
Material and small tools
$0.83
Direct rate (labor, material, and tools)
$2.72 / LF
Overhead 10% of direct
$0.27
Fee 10% of (direct and overhead)
$0.30
Loaded rate
$3.29 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.