Floor loading-zone arrow

$2.96 / LF

PT-194 · MasterFormat 09 91 00 · LF

What’s in this rate

This unit covers Floor loading-zone arrow, measured per linear foot. The painter layouts the loading-zone arrow, masks edges, and rolls or sprays the arrow marking. The rate covers the listed material, 10.00% material waste, labor, and small tools. aisle arrow, fire-lane hash, crosswalk bar, stop bar, parking hash are separate units.

Includes

  • loading-zone directional arrow marking paint
  • layout, ordinary surface preparation, and coating application described above
  • stated material waste and small tools

Excludes

  • aisle arrow
  • fire-lane hash
  • crosswalk bar
  • stop bar
  • parking hash
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.04 hr × $42.00 wage and burden
$1.68
Material and small tools
$0.77
Direct rate (labor, material, and tools)
$2.45 / LF
Overhead 10% of direct
$0.24
Fee 10% of (direct and overhead)
$0.27
Loaded rate
$2.96 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.