Guardrail safety orange

$4.74 / LF

PT-163 · MasterFormat 09 91 00 · LF

What’s in this rate

This unit covers Guardrail safety orange, measured per linear foot. The painter cleans and masks the guardrail, applies orange enamel, and removes masking. The rate covers the listed material, 10.00% material waste, labor, and small tools. Guardrail fabrication, primer, extensive rust removal, handrail coating, access equipment, removals are separate units.

Includes

  • safety-orange industrial enamel for exposed guardrail
  • layout, ordinary surface preparation, and coating application described above
  • stated material waste and small tools

Excludes

  • guardrail fabrication
  • primer
  • extensive rust removal
  • handrail coating
  • access equipment
  • removals
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.07 hr × $42.00 wage and burden
$2.94
Material and small tools
$0.98
Direct rate (labor, material, and tools)
$3.92 / LF
Overhead 10% of direct
$0.39
Fee 10% of (direct and overhead)
$0.43
Loaded rate
$4.74 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.