Handrail safety orange
$4.63 / LF
PT-160 · MasterFormat 09 91 00 · LF
What’s in this rate
This unit covers Handrail safety orange, measured per linear foot. The painter cleans and masks the handrail, applies orange enamel, and removes masking. The rate covers the listed material, 10.00% material waste, labor, and small tools. Handrail fabrication, primer, extensive rust removal, wall repair, access equipment, removals are separate units.
Includes
- safety-orange industrial enamel for exposed handrail
- layout, ordinary surface preparation, and coating application described above
- stated material waste and small tools
Excludes
- handrail fabrication
- primer
- extensive rust removal
- wall repair
- access equipment
- removals
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.07 hr × $42.00 wage and burden
- $2.94
- Material and small tools
- $0.89
- Direct rate (labor, material, and tools)
- $3.83 / LF
- Overhead 10% of direct
- $0.38
- Fee 10% of (direct and overhead)
- $0.42
- Loaded rate
- $4.63 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
