Pipe safety purple band
$2.69 / LF
PT-090 · MasterFormat 09 91 00 · LF
What’s in this rate
This unit is painting one pipe safety purple band. The painter preps the work area, completes the work as specified, and leaves the unit ready for the next operation. The rate is per linear foot. Related field work, removals, and specialty transitions are separate units.
Includes
- Pipe safety purple band material with waste
- prep, layout, and application or set as specified
- small tools
Excludes
- removals / tear-off
- unrelated field systems
- substrate repair beyond preparation
Build-up
- Labor 0.045 hr × $42.00 wage and burden
- $1.89
- Material and small tools
- $0.34
- Direct rate (labor, material, and tools)
- $2.23 / LF
- Overhead 10% of direct
- $0.22
- Fee 10% of (direct and overhead)
- $0.24
- Loaded rate
- $2.69 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
