Safety orange line
$2.38 / LF
PT-152 · MasterFormat 09 91 00 · LF
What’s in this rate
This unit covers Safety orange line, measured per linear foot. The painter lays out the line, masks or machines the edges, applies orange marking, and leaves a uniform stripe. The rate covers the listed material, 10.00% material waste, labor, and small tools. Yellow or red lines, arrows, symbols, surface repair, primer, removals are separate units.
Includes
- traffic-marking coating for a standard-width safety-orange line
- layout, ordinary surface preparation, and coating application described above
- stated material waste and small tools
Excludes
- yellow or red lines
- arrows
- symbols
- surface repair
- primer
- removals
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.03 hr × $42.00 wage and burden
- $1.26
- Material and small tools
- $0.70
- Direct rate (labor, material, and tools)
- $1.96 / LF
- Overhead 10% of direct
- $0.20
- Fee 10% of (direct and overhead)
- $0.22
- Loaded rate
- $2.38 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
