Safety orange line

$2.38 / LF

PT-152 · MasterFormat 09 91 00 · LF

What’s in this rate

This unit covers Safety orange line, measured per linear foot. The painter lays out the line, masks or machines the edges, applies orange marking, and leaves a uniform stripe. The rate covers the listed material, 10.00% material waste, labor, and small tools. Yellow or red lines, arrows, symbols, surface repair, primer, removals are separate units.

Includes

  • traffic-marking coating for a standard-width safety-orange line
  • layout, ordinary surface preparation, and coating application described above
  • stated material waste and small tools

Excludes

  • yellow or red lines
  • arrows
  • symbols
  • surface repair
  • primer
  • removals
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.03 hr × $42.00 wage and burden
$1.26
Material and small tools
$0.70
Direct rate (labor, material, and tools)
$1.96 / LF
Overhead 10% of direct
$0.20
Fee 10% of (direct and overhead)
$0.22
Loaded rate
$2.38 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.