Safety red line
$2.30 / LF
PT-079 · MasterFormat 09 91 00 · LF
What’s in this rate
This unit is striping one linear foot of safety red line. The painter layouts the line, applies red stripe paint, and cleans edges. The rate is per linear foot. Safety yellow line, warehouse floor line, and loading-dock stripe are separate units.
Includes
- red stripe paint with waste
- layout and apply
- edge clean
- small tools
Excludes
- safety yellow line
- warehouse floor line
- loading dock stripe
- field striping
Build-up
- Labor 0.032 hr × $42.00 wage and burden
- $1.34
- Material and small tools
- $0.56
- Direct rate (labor, material, and tools)
- $1.90 / LF
- Overhead 10% of direct
- $0.19
- Fee 10% of (direct and overhead)
- $0.21
- Loaded rate
- $2.30 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
