Safety red line

$2.30 / LF

PT-079 · MasterFormat 09 91 00 · LF

What’s in this rate

This unit is striping one linear foot of safety red line. The painter layouts the line, applies red stripe paint, and cleans edges. The rate is per linear foot. Safety yellow line, warehouse floor line, and loading-dock stripe are separate units.

Includes

  • red stripe paint with waste
  • layout and apply
  • edge clean
  • small tools

Excludes

  • safety yellow line
  • warehouse floor line
  • loading dock stripe
  • field striping

Build-up

Labor 0.032 hr × $42.00 wage and burden
$1.34
Material and small tools
$0.56
Direct rate (labor, material, and tools)
$1.90 / LF
Overhead 10% of direct
$0.19
Fee 10% of (direct and overhead)
$0.21
Loaded rate
$2.30 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.